Investment proposal
To the attention of investors our company presents another project - production facility with ready-made engineering infrastructure, including powerful power supply.
The implemented project is based on two wind turbines with a total electrical capacity of 4 MW. The average annual electricity production from two wind turbines is about 6 million kWh.
Turbines belong to the Enercon E-66/70 family and are built on the principle of direct drive, which is their undoubted advantage over classic machines with a step intensifier, making them more reliable and easy to operate.
The use of a synchronous generator increases the efficiency of the wind turbine in comparison with similar power machines with asynchronous generators.
The pitch control system of the blades allows the rotor to be rotated within a predetermined speed range and thus ensure maximum performance. The operating wind speed range for the Enercon E-66 turbine is 2.5 – 35 m/s.
During the construction of wind turbines, increased monolithic concrete foundations and installation of the turbine tower at the level of +6 m were used. This made it possible to increase the productivity of wind turbines by 6%.
The object is supplied with electricity from three sources of the united energy system. This ensures uninterrupted power supply of the production process. The power allowed for use from the electrical network is 5 MW.
We invite companies using powerful equipment and energy-intensive technologies to cooperate
Our production facility is:
Landscaped territory and ready-made infrastructure. The area of the production facility is 3.8 hectares, including 1.6 hectares of free area for building. The territory is fenced, equipped with a video surveillance system and guarded around the clock. An access road has been built to the facility. There are internal roads and driveways, two car parks for 6 and 13 cars. A one-story insulated metal frame industrial building was built. The height of the building is 9 m, the volume is 4662 m3, the free area is 483 m2. The building has a module with office and amenity premises for staff. The building is equipped with LED interior lighting, high-speed internet, telephone and fire alarms. The power supply capacity of the building is 2.5 MW.
There is a concrete platform on the territory for an open storage warehouse or outdoor placement of technological equipment.
The territory is equipped with outdoor LED lighting.
An artesian well, water supply networks, underground fire tanks were built for household, technological and fire-fighting needs.
To remove atmospheric precipitation from hard surfaces of the territory of the production facility, a closed rain sewer system with treatment facilities was built. The territory is equipped with outdoor LED lighting.
Resources:
- electrical energy (two own wind turbines with a total capacity of 4 MW.
- the power supply capacity allowed for use from the electrical network is 5 MW;
- water (own source of water supply - artesian well. Depth - 45 m, productivity - 6 m3 / h. Compliance of the produced drinking water in terms of chemical, microbiological indicators and radiation safety indicators with the requirements of SanPin 10-124 RB99 and SNiP-213 of 12/28/2012 is confirmed laboratory studies).
Favorable location. The facility is located 4 km from the city of Mogilev at the intersection of transit transport routes. There is a railway nearby.
Address: Republic of Belarus, Mogilev district, Kadinsky s / s, 49 to the west of the village of Podbelye.
Coordinates 53.861515, 30.488917.
Perspective development:
- the possibility of building the existing free area;
- the possibility of increasing the total area of the territory;
- the possibility of increasing the power supply;
- the possibility of building a gas pipeline;
- the possibility of building a railway line